A warm minimalist living room with oat plaster walls, a white oak floor and low linen seating in late afternoon light

Interior design studio / Los Gatos, CA / Since 2016

Rooms you stop noticing because they work.

Six people, one drawing set per house. We design kitchens, renovations and whole homes for people in Los Gatos who would rather get it right once.

The studio

Most rooms fail in the first week, when a tile gets picked before the plan is drawn. We draw first. Every wall, every outlet, every drawer. Then we shop.

Founded
2016
People
6
Houses drawn
140+
Full house, typical
9 to 14 mo

Four rooms

One house in Blossom Hill, walked room by room.

A 1978 ranch, gutted to the studs over nine months. The owners wanted it calm, not empty. Here is how each room earned its keep.

  1. Kitchen with white oak cabinetry, honed limestone counters and an unlacquered brass tap under a window

    01 / Kitchen / 310 sq ft

    Drawn to the millimeter, then built once.

    Rift white oak fronts, honed limestone that will stain a little and look better for it, and a tap that patinas. The island is 42 inches deep so two people can cook without turning sideways. Forty-two drawings, zero change orders.

  2. Living room with oat plaster walls, a white oak floor and a low linen sofa facing a plaster fireplace

    02 / Living / 420 sq ft

    Plaster walls and one long sofa.

    We took the fireplace down to the brick and refaced it in the same lime plaster as the walls, so the room reads as one surface. The sofa is 112 inches and sits low. Nothing hangs on the wall. The light does the decorating.

  3. Bedroom with undyed linen bedding, a plaster headboard wall and a low oak bench at the foot of the bed

    03 / Bedroom / 260 sq ft

    A headboard that is part of the wall.

    The plaster steps forward six inches behind the bed and carries the reading lights, so there are no cords and no nightstand clutter. Undyed linen, a wool rug, a bench for the laundry you have not folded yet.

  4. Bathroom with hand cut zellige tile, a freestanding stone tub and brass fixtures

    04 / Bath / 140 sq ft

    Zellige, stone and nothing chrome.

    Hand cut tile is uneven on purpose. We laid it out on paper first so the cuts land where you do not look. A stone tub, a curbless shower, brass that will go brown in a year. The towel bar is 36 inches from the tub edge, where your hand lands.

Before and after

One living room, eighteen weeks.

Beige carpet, orange oak trim and curtains that ate the light. Same footprint, same windows, no walls moved. Drag the line to see what changed.

Oat lime plaster. Rift white oak floor, 7 inch planks. Sheer linen on a recessed track. One sofa, one chair, one lamp. Full renovation design with contractor coordination, $24,000 design fee.

How renovation design works

Before: a 1990s living room with beige carpet, orange oak trim and heavy pleated curtains After: the same living room with oat plaster walls, a white oak floor and sheer linen at the window

Room style finder

Three questions. One direction.

Not a quiz with a right answer. It just gives the first conversation a name and three materials to argue about.

01 Light
02 Lines
03 Materials

Your room leans

Soft modern

Plaster, pale oak and linen, with rounded edges and nothing shiny.

  • Oat plaster
  • White oak
  • Undyed linen

A starting point for the first conversation, not a design. Every room gets drawn before anything is picked.

A white oak kitchen with limestone counters, shown with a colour wash that changes as you choose a material

Hover or tab across a material to try it on the room.

Materials

Try a material on the room.

Six things we keep coming back to. Hover or focus one and the kitchen takes on its cast. A trick, not a render, but it gets the conversation started faster than a sample board.

Why we use each one

How a project runs

Six phases, in the same order, every time.

You always know which phase you are in, what it costs and what you are deciding this week.

  1. 01

    Walk

    Two hours in the house. We measure, listen and tell you what it will take.

    Week 1
  2. 02

    Plan

    Floor plans and three directions for the look. You pick one.

    Weeks 2 to 5
  3. 03

    Draw

    Every elevation, every cabinet, every light. The set the contractor bids from.

    Weeks 6 to 12
  4. 04

    Select

    Tile, stone, hardware, fabric. Samples in your light, not ours.

    Weeks 10 to 14
  5. 05

    Build

    Weekly site visits. We answer the contractor so you do not have to.

    Months 4 to 10
  6. 06

    Install

    Furniture, art, the last pillow. One day. You come home to a finished house.

    Final week

Walk through the whole process

From clients

They drew the kitchen for six weeks before we picked a single thing. I was impatient. Then the bids came in within four percent of each other.

Hannah and Marcus T. / Blossom Hill, Los Gatos

The install took one day. We went to lunch and came home to a house. I still open the drawers just to see them close.

Devika R. / Saratoga

Read all nine reviews

Start here

Tell us about the house.

A principal reads every request. We reply within one business day to set up a consult, and we will tell you straight if the project is not a fit.

Or call the studio
(408) 555-0103

22 University Ave, Los Gatos
Mon to Fri, 9am to 5pm, by appointment

Phone or email, whichever you check more. One is enough.

A principal reads every request. We reply within one business day.